Tamalpais Valley Railroad

We move stuff there and back again

 

Home

Community

Humor

Links

Previous Polls

Feedback

Micro Book

Wireless DCC

Blog

X2011 Convention

LED Lighting

Donner Summit Progress

Feb 18 Frog Power

Jan 18 DIY DCC Decoders

Jan 8 - Donner Summit v3

Jan 6 09 - Slim Princess

Oct 23 - Sound Xperiment

Oct 15-Construction Start

Sep15 - Main St Colfax

Sep 1 08 - Focus Stacking

Aug 15 08 - Colfax Depot

Aug 4 08 New Layout 2

Jul 31 08 New Layout Plan

Jul 22 08 - Snow in Ogden

Jul 19 08 McCloud Railway

Jul 8 Solar and Profits

Jun 27 08 AC-12 4294

Jun 23 08 Donner Trip

Jun 19 08 SP GP9 #5623

Jun 18 08 Depth of Field

Jun 16 2008 Craftsman Kit

Jun 15 2008 Cab Forwards

Jun 14 2008 Rivet Count

Jun 13 2008 Why?

Jun 12 2008 White Balance

Jun 11 2008 Photography

Gallery

Gallery 2

Videos

Construction

How-to

Water

Trees

Grass

Terrain

Servo Switch Decoder

Trackplan

Prototype

SP Railroad Atlas

Surveying the New Construction
Oct 13 2008 - Construction Started on New Layout!

Hooray!  I finally started construction on the new Donner Summit layout!  To the left you can see the surveying crew busy at work figuring out where to place the next beam.

Blog entries have been slow lately due to the delay of painting and restoring the layout shed.  I replaced a lot of dry rotted wood, added new flashing, fixed a number of leaks in the roof, cleaned and painted the exterior.  I also snuck a business ttrip to Europe in there.  Still planned is a deck in front of the building for people to lounge on and to put my table-saw and planer on during construction projects.

I have started building the staging basement level.  I need to finish it to the stage of operating track-work as it will be hard to get to once the next level is put on due to low clearance.  I have bought all the switches (Atlas #6 for economy) and flex-track (Atlas Code 100) and should be laying it next week.  After that I will build the helix and start the lower level.  Keep you posted!  Hopefully it won't be so long until my next post.


The newly restored and painted workshop metal shed - site of the new layout.
Next->


Blog List
Jan 6 09 - Slim Princess
Oct 23 - Sound Xperiment

Oct 15 - Construction Started
Sep 15 - Main St Colfax
Sep 1 - Focus Stacking
Aug 15 - Colfax Depot
Aug 4 - Donner Summit 2
Jul 31 - Planning the Next Layout

Jul 22 - Snow in Ogden
Jul 19 - McCloud Railway
Jul 8 - Solar and Profits
Jun 27 - AC-12 4294
Jun 23 - Donner Pass Trip
Jun 19 - SP GP9 #5623
Jun 18 - Depth of Field Test
Jun 16 - Craftsman Kit
Jun 15 - Cab Forwards
Jun 14 - Counting Rivets
Jun 13 - Why MR is cool
Jun 12 - White Balance
Jun 11 - Photography

RSS feed

Subscribe in a reader
Blog Roll

Confessions of a Model Train Geek
CNJ Bronx Terminal
Modelrailroading.wordpress.com
Dan's Train Blog
Lebanon Railroads
Westport Terminal RR
Rob Hinkle's Blog
Espee Mike



© Copyright 2012 by Duncan McRee, All Rights Rreserved - dmcree at tamvalleyrr dot com

Website powered by Network Solutions®