Tamalpais Valley Railroad

We move stuff there and back again

 

Home

Community

Humor

Links

Previous Polls

Feedback

Micro Book

Wireless DCC

Blog

X2011 Convention

LED Lighting

Donner Summit Progress

Feb 18 Frog Power

Jan 18 DIY DCC Decoders

Jan 8 - Donner Summit v3

Jan 6 09 - Slim Princess

Oct 23 - Sound Xperiment

Oct 15-Construction Start

Sep15 - Main St Colfax

Sep 1 08 - Focus Stacking

Aug 15 08 - Colfax Depot

Aug 4 08 New Layout 2

Jul 31 08 New Layout Plan

Jul 22 08 - Snow in Ogden

Jul 19 08 McCloud Railway

Jul 8 Solar and Profits

Jun 27 08 AC-12 4294

Jun 23 08 Donner Trip

Jun 19 08 SP GP9 #5623

Jun 18 08 Depth of Field

Jun 16 2008 Craftsman Kit

Jun 15 2008 Cab Forwards

Jun 14 2008 Rivet Count

Jun 13 2008 Why?

Jun 12 2008 White Balance

Jun 11 2008 Photography

Gallery

Gallery 2

Videos

Construction

How-to

Water

Trees

Grass

Terrain

Servo Switch Decoder

Trackplan

Prototype

SP Railroad Atlas

Counting Rivets

If you have looked at this website carefully you may have noticed that I am not a rivet counter. What's a rivet counter? That is the guy who looks at your latest contest quality model and says, "its nice but actually after World War II those engines were produced with 28 rivets on the rear door except for the phase II a which had 30". Actually I have never met a rivet-counter. My experience is that all my fellow modelers are far too nice to ever say something so picky to me. The rivet-counter is a mythical being that is invoked to explain that you realize your models have limits and you are OK with it, as in "not being a rivet-counter or anything I didn't add EVERY detail".

So how much detail should I add? It is an easy question if you are building contest quality models. Every one. However, such a model can take a LONG time to build. If you are building a layout and take the attitude that it will be the best layout ever filled with contest quality modeling, then you had better get your children into the hobby in the hope they can have their children finally finish the layout as a generational project. On the other hand, too low a level of detail and the layout may not look interesting enough to you and you may get tired of it quickly.

As a compromise, I find that I like to finish a scene to a good-enough quality level on the first pass. Then I go back and add more detail later such as more grass, more trees, buildings, telephone poles, and barbed wire fencing. This also has the effect of renewing old scenes and giving them a fresh look. It lets me set up a whole new set of pictures to record the new look. I include an example of two pictures of the same area taken a year or so apart. The first is just after the scene was built and the later one after I added a lot more foliage.

In the same vein I never finish parts of the model you won’t see. Most of my buildings have nothing inside but a lightbulb. If I know the backside will never be seen, I probably won’t finish it. Most of my structures are kits that were close enough to the prototype to be believable. Otherwise I would need to scratch-build almost everything as the manufacturers of kits rarely ever come out with something just like the building I want. I do scratch-build signature buildings. But even these are mostly just representations from looking at old black and white photos and trying to guess dimensions and colors. It would be satisfying to be a true prototype modeler like Jack Burgess and his Yosemite Valley Railroad which as I understand it has nearly every rivet, but I just don’t have the patience to research everything so thoroughly.

The goal is to get the whole layout finished so I can enjoy running the trains through the scenery. Eventually I hope to be able to run the trains through scenery with all the rivets correct. If you see a rivet out of place don’t hesitate to let me know so I can put in on to-do list.
Version 1 of the desert scene
A later scene with barbed wire fencing and telephone poles added. Also fixed the mountains on the backdrop.
 
Next->


Blog List
Sep 1 2008 - Focus Stacking
Aug 15 - Colfax Depot
Aug 4 - Donner Summit Layout 2
Jul 31 2008 - Planning the Next Layout

Jul 22 2008 - Snow in Ogden
Jul 19 2008 - McCloud Railway
Jul 8 2008 - Solar and Profits
Jun 27 2008 - AC-12 4294
Jun 23 2008 - Donner Pass Trip
Jun 19 2008 - SP GP9 #5623
Jun 18 2008 - Depth of Field Test
Jun 16 2008 - Craftsman Kit
Jun 15 2008 - Cab Forwards
Jun 14 2008 - Counting Rivets
Jun 13 2008 - Why MR is cool
Jun 12 2008 - White Balance
Jun 11 2008 - Photography

RSS feed

Subscribe in a reader
Blog Roll

Confessions of a Model Train Geek
CNJ Bronx Terminal
Modelrailroading.wordpress.com
Dan's Train Blog
Lebanon Railroads
Westport Terminal RR
Rob Hinkle's Blog



© Copyright 2012 by Duncan McRee, All Rights Rreserved - dmcree at tamvalleyrr dot com

Website powered by Network Solutions®